EUCA Final: Three Years on the Island.
EUCA sits on a sandy hill on North Stradbroke Island, looking out to the ocean. Designed by Synergy Building Design and built by AMD Constructions over three years, it pairs heavy off-form concrete and a cantilevered pool with timber ceilings and walls of glass. This is the Final we made to close it out.
It started with a site walk more than three years ago. Aaron Duggan walked the block with clients AMD have known for over 20 years and looked out at the ocean. The vision they had from those early days was ambitious, and the finished home went past it. On one hand there are the heavy architectural elements: off-form concrete and a pool suspended in mid-air. On the other, the delicate ones: timber ceilings and vast walls of glass.


"I always imagined it to be a really epic home, but to walk through here as it is today just exceeds our expectations."
Nothing about an island build is simple. Getting materials and equipment across was hard, and with no concrete pumps on the island, AMD bought their own. The site was sandy enough that they needed new gear just to get concrete up the hill.
The hardest part was strict flame zone compliance: meeting bushfire requirements on a home whose architecture is built on timber and glass. And the cantilevered pool sat so far between structural engineering and pool building that, after talking to a few pool contractors, AMD built it in-house. The site manager and the carpenter tell their side in two short films.
We captured EUCA across the build, one day a month out on site with the AMD team, and we loved every minute of it. By the end we knew EUCA like the back of our hand: where the morning light falls on the off-form concrete, the angle that shows the pool hanging over the hill, the details in the timber ceilings worth slowing down for. That’s what being there for the whole process gives you. When the Final came, nothing was a guess.


We spent a full day at the project: morning and afternoon light, drone and camera work, interviews with Aaron and the AMD team. Out of it came six pieces around one editorial thread: a teaser to open the campaign, the Final film, two short films with the team behind the build, a testimonial, and a full photography suite.


Like every Final we make, it’s restrained and considered, so the architecture and the team behind it carry the story, not the edit.




Aaron, in the Final: "The location has been challenging, and the EOS team just embraced it from the first day they came over here. They've been excited to be here every visit thereafter."
In 26 years of building, Aaron calls EUCA, for its sheer scale and its location, the icing on the cake. The Final is how the rest of the market gets to see why.
Watch the EUCA Final on YouTube +
North Stradbroke Island · Designed by Synergy Building Design · Built by AMD Constructions
Watch the Final +Sound like where you are?
Fifteen minutes. We'll tell you where the brand is being pulled apart and what to fix first.